The jack up rig was dry towed from Singapore, with Cameroon being the destination where the rig will be working for a18-month duration. Both AMT Cameroon & AMT Singapore played a pivotal role in ensuring the success of this operation. AMT Cameroon was agent for rig, along with 3 towboats, which was delivered by the heavy lift vessel to Luba, Equatorial Guinea. Upon its arrival in Luba, the rig was floated off with the assistance of the Luba Harbour tugs and the tow vessels. Thereafter it was wet towed to Cameroon to start drilling operations.